翻訳と辞書
Words near each other
・ Askellia pygmaea
・ Askenazy school
・ Askepasma
・ Askeptosauridae
・ Askeptosauroidea
・ Askeptosaurus
・ Asker
・ Asker (disambiguation)
・ Asker Aliens B.C.
・ Asker and Bærum District Court
・ Asker Delok
・ Asker Dzhappuyev
・ Asker Fotball
・ Asker Hundred
・ Asker Jeukendrup
Asker Line
・ Asker Seminary
・ Asker SK
・ Asker SK (speed skating)
・ Asker SK (swimming)
・ Asker Station
・ Asker Upper Secondary School
・ Askerabad
・ Askeran
・ Askeran (town)
・ Askeran clash
・ Askeran District (NKAO)
・ Askeran Fortress
・ Askeran Region
・ Askerhallen


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Asker Line : ウィキペディア英語版
Asker Line

The Asker Line ((ノルウェー語:Askerbanen)) is a railway line between Asker and Lysaker in Norway. The line runs along the same corridor as the Drammen Line, offering increased capacity, speed and regularity on the rail network west of Oslo. The first part opened in 2005, and in 2011 an extension opened from Sandvika to Lysaker. An extension to Skøyen in Oslo will perhaps be built after 2020. Most of the railway is in tunnel and is dimensioned for running. The entire railway is electrified at . The first section cost , while the second is budgeted at NOK 2.7 billion.
The purpose of the new line is to allow regional and express trains to run directly between Asker Station, Sandvika Station and Lysaker Station, without being slowed and delayed by commuter trains that make frequent stops at intermediate stations. The Asker Line will improve regularity, and capacity will increase from 12 to 26 trains per hour in each direction. Travel time from Asker to Skøyen Station will be reduced from 20 to 13 minutes. The line has received criticism for not being a true high-speed line, and for Lysaker Station not being in compliance with accessibility requirements. Similar parallel, high-speed lines have been or will be built northeast and southeast of Oslo.
The line is built, owned and maintained by the Norwegian National Rail Administration. At Sandvika, the line connects to the Drammen Line, which runs to Oslo Central Station in the east. At Asker, the line connects to the Spikkestad and Drammen Lines; the latter connects to the Sørland- and Vestfold Line at Drammen. The line is served by Norwegian State Railways with regional trains to Vestfold, Buskerud and Telemark, and the express trains along the Sørland Line and the Bergen Line; in addition, the Airport Express Train operates from Asker to Oslo Airport, Gardermoen. During night, freight trains also use the line.
==Background==
Following the construction of the high-speed Gardermoen Line from Oslo, via Oslo Airport, Gardermoen, to Eidsvoll, the Norwegian Ministry of Transport and Communications started planning additional high-speed lines west and southeast of Oslo. The Asker and Follo Lines would allow express and regional trains to travel faster and more reliably to Drammen and Ski, leaving the old tracks for slower freight trains, and commuter trains making frequent stops. Construction of the Follo Line will, at the earliest, be completed in 2015.
The Gardermoen Line had shown that profits could be made by operating passenger trains, but that it would not be possible to debt-finance short-distance tracks in Eastern Norway. Therefore, a conventional financial method for the Asker Line was started. While the railway is entirely financed through allocation through the state budget, the prioritising was secured through a political compromise for investments in Greater Oslo, the Oslo Package 2. Financing of a diverse range of road and public transport investments—including new motorways, extension of the Oslo Metro and new railways—would be made through a "package". This involved both state, county and toll funding being collected in one lot, and then redistributing the funds to the agencies responsible for the investments.〔(【引用サイトリンク】title=This information is in English )
Prior to the construction, the Western Corridor had a capacity of 12–14 trains per hour in each direction west of Skøyen. The first section of the Asker Line, from Asker to Sandvika, increased the capacity with an additional two trains. The opening of Lysaker Station will increase capacity with four more, since all stations along the line between Oslo and Drammen will then have four platforms. When the whole line is completed, total capacity in the Western Corridor will be 26 trains per hour. This is equivalent to 5,500 cars per hour, and exceeds the capacity of a four-lane motorway.
The Asker Line is also a necessary component to allow a high-speed route to be built along the Vestfold and Ringerike Lines. The former is planned to branch off at Drammen, while the latter would branch of at Sandvika, and become a shortening of the Bergen Line.〔 〕 The first sections of the upgraded Vestfold Line opened in 1995 and 2001, and additional proposals are under planning for the remaining sections.〔 〕

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Asker Line」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.